PLATE LOAD TEST FOR 250T/SQN IN GREEN&BROWN FIELDS
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 14 Point; Peak manpower: 6 man-days/day; Accumulated manpower: 100 man-days
RENTAL PAINTERS FOR CIVIL WORKS
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 5 EA; Peak manpower: 5 man-days/day; Accumulated manpower: 350 man-days
RENTAL HELPERS WITH VMS FOR SHU FENCE INSTALLATION WORK
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 390 Hours; Peak manpower: 5 man-days/day; Accumulated manpower: 35 man-days
ASPHALT WORKS AT DRESS-UP YARD
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 2350 M2; Peak manpower: 14 man-days/day; Accumulated manpower: 420 man-days
VERTICAL COLUMN ALIGNMENT WORK
KSA
Project Overview
Scope of Work
Mechanical works; Major work volume: 1 Lot; Peak manpower: 4 man-days/day; Accumulated manpower: 22 man-days
THE MODULE TRANSPORTATION ROUTE
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 58000 M2; Peak manpower: 38 man-days/day; Accumulated manpower: 4680 man-days
HEAVY DUTY METAL RAMP-SHU AREA
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 20 Nos; Peak manpower: 8 man-days/day; Accumulated manpower: 48 man-days
400 Sqmm HV CABLE PULLING WORKS
KSA
Project Overview
Scope of Work
Electrical works; Major work volume: 1 Lot; Peak manpower: 58 man-days/day; Accumulated manpower: 4500 man-days
GROUNDING CABLE PULLING WORKS
KSA
Project Overview
Scope of Work
Electrical works; Major work volume: 1 Lot; Peak manpower: 22 man-days/day; Accumulated manpower: 600 man-days
SUPPLY OF HANDRAIL FOR OBSERVATION PLATFORM
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 125 LM; Peak manpower: 4 man-days/day; Accumulated manpower: 240 man-days
ELECTRICAL STEEL STRUCTURE COLUMN MODIFICATION WORK
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 114 EA; Peak manpower: 8 man-days/day; Accumulated manpower: 260 man-days
PMT OFFICES FOR BROWN FIELD AREA_4 UNITS
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 4 EA; Peak manpower: 30 man-days/day; Accumulated manpower: 750 man-days
RAMP ROAD WORKS AT LAYDOWN AREA
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 360 M2; Peak manpower: 12 man-days/day; Accumulated manpower: 260 man-days
FABRICATION & SUPPLY OF GI STRAIGHT LADDER CABLE TRAY WITH ACCESSORIES
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 2000 MTR; Peak manpower: 5 man-days/day; Accumulated manpower: 650 man-days
EXISTING DITCH CLEANING, GRADING AND HDPE PIPE HOLE DRILLING
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 13916 LS; Peak manpower: 16 man-days/day; Accumulated manpower: 450 man-days
FABRICATION AND SUPPLY OF AC OUTDOOR UNIT WALL HANGER
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 20 EA; Peak manpower: 6 man-days/day; Accumulated manpower: 3 man-days
MECHANICAL FABRICATION, SUPPLY AND INSTALLATION WORKS
KSA
Project Overview
Scope of Work
Mechanical works; Major work volume: 1 Lot; Peak manpower: 86 man-days/day; Accumulated manpower: 6880 man-days
CIVIL CONSTRUCTION SREVICE – TANK FOUNDATION & WALL
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 1 Lot; Peak manpower: 18 man-days/day; Accumulated manpower: 5928 man-days
GROUND PENETRATING RADAR(GPR) SURVEY ACTIVITY FOR AUGUR DRILLS POINTS IN BROWN FIELD AREA
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 12 EA; Peak manpower: 8 man-days/day; Accumulated manpower: 48 man-days
HORIZONTAL DIRECTIONAL DRILLING(HDD) FOR INSTALLATION OF HDEP PIPES FOR 115KV CABLE ROUTE
KSA
Project Overview
Scope of Work
Civil works; Major work volume: 1440 MTR; Peak manpower: 40 man-days/day; Accumulated manpower: 6240 man-days