OVERHEAD FENCE INSTALLATION WORK
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 1 Lot; Peak manpower: 34 man-days/day; Accumulated manpower: 960 man-days
HEAVY DUTY METAL RAMP-SHU AREA
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 20 Nos; Peak manpower: 8 man-days/day; Accumulated manpower: 48 man-days
SUPPLY OF HANDRAIL FOR OBSERVATION PLATFORM
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 125 LM; Peak manpower: 4 man-days/day; Accumulated manpower: 240 man-days
ELECTRICAL STEEL STRUCTURE COLUMN MODIFICATION WORK
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 114 EA; Peak manpower: 8 man-days/day; Accumulated manpower: 260 man-days
FABRICATION & SUPPLY OF GI STRAIGHT LADDER CABLE TRAY WITH ACCESSORIES
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 2000 MTR; Peak manpower: 5 man-days/day; Accumulated manpower: 650 man-days
FABRICATION AND SUPPLY OF AC OUTDOOR UNIT WALL HANGER
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 20 EA; Peak manpower: 6 man-days/day; Accumulated manpower: 3 man-days
FABRICATION AND SUPPLY OF AC OUTDOOR UNIT WALL HANGER
KSA
Project Overview
Scope of Work
Steel Structure works; Major work volume: 16 EA; Peak manpower: 6 man-days/day; Accumulated manpower: 120 man-days