Steel Structure

OVERHEAD FENCE INSTALLATION WORK

KSA

Add a featured image from the project editor.

Project Overview

Scope of Work

Steel Structure works; Major work volume: 1 Lot; Peak manpower: 34 man-days/day; Accumulated manpower: 960 man-days

Project IDPOOL-032
Owner / ClientSAUDI ARAMCO
Main ContractorSAMSUNG E&A ARABIA CO.LTD.
LocationKSA
CategorySteel Structure
Start Year2026
StatusOngoing
PO / Reference NumberSA139F