HORIZONTAL DIRECTIONAL DRILLING (HDD) AND PIPE INSTALLATION WORKS FOR 16″FW LINE
KSA
Add a featured image from the project editor.
Project Overview
Scope of Work
Mechanical works; Major work volume: 320 Meters; Peak manpower: 35 man-days/day; Accumulated manpower: 60 man-days
Project IDPOOL-035
Owner / ClientSAUDI ARAMCO
Main ContractorSAMSUNG E&A ARABIA CO.LTD.
LocationKSA
CategoryMechanical
Start Year2026
StatusOngoing
PO / Reference NumberSA139F